Art Anderson provided a heat load calculation in the Galley and Bakery on board, as well as provided a pressure loss calculations and system balance between systems. An Excel workbook with the removal and installation equipment and weights was also created.

Complete previously started heat load calculation in the Galley (4-52-0-Q) and Bakery (4 59 0 Q). Provide pressure loss calculations and system balance between systems: E110, E125, S73, & S78. This is to ensure the appropriate quantities of supply and exhaust air are provided when the Gaylord hoods are on and when they are off. Provide sizing and selection for fans and check sizing for existing Gaylord hoods. Replacing the Gaylord hoods. Provide one drawing modifying the following systems: E110, E125, S73, & S78. Provide an Excel workbook with the removal and installation equipment and weights. Provide deliverables for MSC review within 30 calendar days of Authorization to Proceed.

 

PROJECT DATA

DELIVERED ON TIME

DELIVERED ON BUDGET

6 CURRENT ART ANDERSON STAFF INVOLVED