---
title: "BARN WATER MAIN EXTENSION"
url: https://artanderson.com/barn-structural-review-and-water-line-design/
type: page
date: 2022-08-03
modified: 2025-08-18
markdown_url: https://artanderson.com/barn-structural-review-and-water-line-design.md
author: "Brittany Wax"
---

# BARN WATER MAIN EXTENSION

[RETURN TO PROJECTS >](/projects-gallery)

 

 

 
 
 
 
 

 
 
 
 
 
 
 
 
 
 
 

# BARN STRUCTURAL REVIEW AND WATER LINE DESIGN

 

 
 
 
 
 Art Anderson was hired to design a 1,200 foot, 8-inch diameter water main extension from Mile Hill Drive down through Long Lake Road to the Howe Farm Park to provide waterflow to Howe Barn. This required coordination with West Sound Utility District and Kitsap County Department of Public Works.

 

 

 

 
 
 
 
 
 
 
 
 
 ![](https://artanderson.com/wp-content/uploads/2022/08/6.-Barn-Structural-Review-Water-Line-Design-Howe-Farm.jpg)
 

 
 
 
 
 PROJECT DATA

 

 
 
 
 
 
 ![Location Icon](https://artanderson.com/wp-content/uploads/2025/08/Location.png)

 
 

#### KITSAP COUNTY, WASHINGTON

 
 

 

 

 
 
 
 
 
 ![Check Icon](https://artanderson.com/wp-content/uploads/2025/08/Check.png)

 
 

#### DELIVERED ON TIME & BUDGET

 
 

 

 

 
 
 
 
 
 ![Key Icon](https://artanderson.com/wp-content/uploads/2025/08/Key.png)

 
 

#### PROJECT FEATURES

 

- ##### Local Government

- ##### Parks & Recreation Facility Design

- ##### Civil Design
